The City must require a detailed emergency access analysis, truck route restrictions, turning-movement review, loading-dock circulation controls, and enforceable operational limits before considering approval.
Read MoreThe City must require a detailed emergency access analysis, truck route restrictions, turning-movement review, loading-dock circulation controls, and enforceable operational limits before considering approval.
Read MoreThe project proposes to demolish a 5,172-square-foot building and lumber yard facility to construct two industrial warehouse buildings totaling 186,680 square feet. Compared to the existing land use on the site, the Project will generate 56 more daily trips, with 64 more trips in the morning peak hour and 53 more trips in the evening peak hour.
Read MoreDistribution centers move millions of units in bulk to a few destinations, fulfillment centers process countless individual units one-by-one to many different addresses.
Read MoreAccording to the VMT Assessment, The Trip Generation Memorandum estimates a total of 187 employees for the site. Employment at the existing site accounts for 35 unique employee vehicles at a given time, in two separate shifts throughout the day. (70)
Read More